Combined Scheduling and Control

Projects.ControlScheduling History

Hide minor edits - Show changes to output

July 06, 2019, at 11:31 PM by 174.148.198.67 -
Changed line 19 from:
# Beal, L.D., Petersen, D., Grimsman, D., Warnick, S., Hedengren, J.D., Integrated Scheduling and Control in Discrete-time with Dynamic Parameters and Constraints, Computers & Chemical Engineering, 115, pp. 361-376, 2018. [[https://doi.org/10.1016/j.compchemeng.2018.04.010|Article]], [[https://authors.elsevier.com/a/1X1CfMK3kltAG|Free Access Until July 2018]]
to:
# Beal, L.D., Petersen, D., Grimsman, D., Warnick, S., Hedengren, J.D., Integrated Scheduling and Control in Discrete-time with Dynamic Parameters and Constraints, Computers & Chemical Engineering, 115, pp. 361-376, 2018. [[https://doi.org/10.1016/j.compchemeng.2018.04.010|Article]]
May 22, 2018, at 11:21 PM by 10.5.113.123 -
Changed lines 31-33 from:
* Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, Computers & Chemical Engineering, 104, pp. 271-282, 2017, doi: 10.1016/j.compchemeng.2017.04.024 [[http://www.sciencedirect.com/science/article/pii/S0098135417301874|Article]]

* Mojica, J.L., Petersen, D.J., Hansen, B., Powell, K.M., Hedengren, J.D., Optimal Combined Long-Term Facility Design and Short-Term Operational Strategy for CHP Capacity Investments, Energy, 118, pp. 97–115, 2017. [[http://www.sciencedirect.com/science/article/pii/S036054421631814X|Article]]
to:
# Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, Computers & Chemical Engineering, 104, pp. 271-282, 2017, doi: 10.1016/j.compchemeng.2017.04.024 [[http://www.sciencedirect.com/science/article/pii/S0098135417301874|Article]]

# Mojica, J.L., Petersen, D.J., Hansen, B., Powell, K.M., Hedengren, J.D., Optimal Combined Long-Term Facility Design and Short-Term Operational Strategy for CHP Capacity Investments, Energy, 118, pp. 97–115, 2017. [[http://www.sciencedirect.com/science/article/pii/S036054421631814X|Article]]
May 22, 2018, at 11:21 PM by 10.5.113.123 -
Added lines 18-29:

# Beal, L.D., Petersen, D., Grimsman, D., Warnick, S., Hedengren, J.D., Integrated Scheduling and Control in Discrete-time with Dynamic Parameters and Constraints, Computers & Chemical Engineering, 115, pp. 361-376, 2018. [[https://doi.org/10.1016/j.compchemeng.2018.04.010|Article]], [[https://authors.elsevier.com/a/1X1CfMK3kltAG|Free Access Until July 2018]]

# Hedengren, J.D., Beal, L., Special Issue: Combined Scheduling and Control, Processes, 6(3), 24, doi: 10.3390/pr6030024, 2018. [[http://www.mdpi.com/2227-9717/6/3/24/htm|Editorial]] and [[http://www.mdpi.com/journal/processes/special_issues/Combined_Scheduling|Special Issue]]

# Beal, L.D., Petersen D., Pila G., Davis, B., Warnick, S., and Hedengren, J.D., Economic Benefit from Progressive Integration of Scheduling and Control for Continuous Chemical Processes, Processes, 5(4), 84, doi:10.3390/pr5040084, 2017. [[http://www.mdpi.com/2227-9717/5/4/84/htm|Article (Open Access)]]

# Petersen, D., Beal, L.D., Prestwich D., Warnick, S., and Hedengren, J. D., Combined Noncyclic Scheduling and Advanced Control for Continuous Chemical Processes, Processes, 2017, Processes, 5(4), 83, doi:10.3390/pr5040083, 2017. [[http://www.mdpi.com/2227-9717/5/4/83/htm|Article (Open Access)]]

# Udy, J., Hansen, B., Maddux, S., Peterson, D., Heilner, S., Stevens, K., Lignell, D., Hedengren, J.D., Review of Field Development Optimization of Waterflooding, EOR, and Well Placement Focusing on History Matching and Optimization Algorithms, Processes, 5(3), 34, 2017, doi:10.3390/pr5030034. [[http://www.mdpi.com/2227-9717/5/3/34|Article (Open Access)]]

# Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, Computers & Chemical Engineering, 104, pp. 271-282, 2017, doi: 10.1016/j.compchemeng.2017.04.024 [[http://www.sciencedirect.com/science/article/pii/S0098135417301874|Article]]
July 13, 2017, at 12:31 PM by 45.56.3.173 -
Changed lines 19-21 from:
* Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, 2017, doi: 10.1016/j.compchemeng.2017.04.024 [[https://authors.elsevier.com/a/1V1G7MK3ki2jo|Article (Free Access until July 17)]]

* Mojica, J
.L., Petersen, D.J., Hansen, B., Powell, K.M., Hedengren, J.D., Optimal Combined Long-Term Facility Design and Short-Term Operational Strategy for CHP Capacity Investments, Energy, Vol 118, 1 January 2017, pp. 97–115. [[http://www.sciencedirect.com/science/article/pii/S036054421631814X|Article]]
to:
* Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, Computers & Chemical Engineering, 104, pp. 271-282, 2017, doi: 10.1016/j.compchemeng.2017.04.024 [[http://www.sciencedirect.com/science/article/pii/S0098135417301874|Article]]

* Mojica, J.L., Petersen, D
.J., Hansen, B., Powell, K.M., Hedengren, J.D., Optimal Combined Long-Term Facility Design and Short-Term Operational Strategy for CHP Capacity Investments, Energy, 118, pp. 97–115, 2017. [[http://www.sciencedirect.com/science/article/pii/S036054421631814X|Article]]
June 21, 2017, at 02:20 AM by 45.56.3.173 -
Deleted lines 5-6:

!! Combined Control and Scheduling
June 20, 2017, at 07:31 PM by 173.117.128.86 -
Changed line 23 from:
* Mojica, J.L., Petersen, D.J., Hansen, B., Powell, K.M., Hedengren, J.D., Optimal Combined Long-Term Facility Design and Short-Term Operational Strategy for CHP Capacity Investments, Energy, Vol 118, 1 January 2017, pp. 97–115. [[https://authors.elsevier.com/a/1UEQ7_8CgI-dD6|Article]]
to:
* Mojica, J.L., Petersen, D.J., Hansen, B., Powell, K.M., Hedengren, J.D., Optimal Combined Long-Term Facility Design and Short-Term Operational Strategy for CHP Capacity Investments, Energy, Vol 118, 1 January 2017, pp. 97–115. [[http://www.sciencedirect.com/science/article/pii/S036054421631814X|Article]]
June 01, 2017, at 01:28 PM by 66.87.127.154 -
Changed line 21 from:
* Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, 2017, doi: 10.1016/j.compchemeng.2017.04.024. [[Attach:beal2017_control_scheduling.pdf|Preprint]] | [[https://authors.elsevier.com/a/1V1G7MK3ki2jo|Article (Free Access until July 17)]]
to:
* Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, 2017, doi: 10.1016/j.compchemeng.2017.04.024 [[https://authors.elsevier.com/a/1V1G7MK3ki2jo|Article (Free Access until July 17)]]
June 01, 2017, at 01:26 PM by 66.87.127.154 -
Added lines 21-23:
* Beal, L., Park, J., Petersen, D., Warnick, S., Hedengren, J.D., Combined Model Predictive Control and Scheduling with Dominant Time Constant Compensation, 2017, doi: 10.1016/j.compchemeng.2017.04.024. [[Attach:beal2017_control_scheduling.pdf|Preprint]] | [[https://authors.elsevier.com/a/1V1G7MK3ki2jo|Article (Free Access until July 17)]]

* Mojica, J.L., Petersen, D.J., Hansen, B., Powell, K.M., Hedengren, J.D., Optimal Combined Long-Term Facility Design and Short-Term Operational Strategy for CHP Capacity Investments, Energy, Vol 118, 1 January 2017, pp. 97–115. [[https://authors.elsevier.com/a/1UEQ7_8CgI-dD6|Article]]
December 13, 2016, at 10:30 PM by 10.10.147.210 -
Changed lines 1-2 from:
(:title Super Combiner-do:)
to:
(:title Combined Scheduling and Control:)
Deleted lines 6-7:
Deleted lines 8-9:
Changed line 19 from:
Support for this research comes from the Nation Science Foundation.
to:
Support for this research comes from the Nation Science Foundation, Award 1547110.
Changed lines 13-14 from:
Current process control and optimization strategies are typically divided in three major sections: base layer controls, advanced controls, and planning and scheduling [1]. Each of these levels works at a different time scale, ranging from milliseconds to seconds for base controls, up to months or years at the planning and scheduling level.
to:
Current process control and optimization strategies are typically divided in three major sections: base layer controls, advanced controls, and planning and scheduling. Each of these levels works at a different time scale, ranging from milliseconds to seconds for base controls, up to months or years at the planning and scheduling level.
Changed line 21 from:
Our team is investigating methods to overcome the deficiencies of the segregated system while maintaining robust and timely optimizations for both scheduling and control objectives.
to:
Our team is investigating methods to overcome the deficiencies of the segregated system while maintaining robust and timely optimizations for both scheduling and control objectives. These novel algorithms are applied to petrochemical processes, such as the UNIPOL™ reactor, for testing.
Added lines 1-26:
(:title Super Combiner-do:)

(:keywords research group, Brigham Young University, Process System Engineering:)

(:description Process Research and Intelligent Systems Modeling (PRISM) Group at Brigham Young University:)



!! Combined Control and Scheduling



Current process control and optimization strategies are typically divided in three major sections: base layer controls, advanced controls, and planning and scheduling [1]. Each of these levels works at a different time scale, ranging from milliseconds to seconds for base controls, up to months or years at the planning and scheduling level.

Attach:proposed_app.png

In an effort to simplify models and decrease computation time, each of these layers receives a minimal amount of information to fulfill its objective. However, this lack of information creates lost opportunities. For example, the scheduling program may pass a set of unreachable set points to the advanced controls, or the base controls could reach a set point through a suboptimal path due to its lack of knowledge regarding process nonlinearities that the advanced controls had incorporated.

This control structure is largely an artifact of the development of process control and the computational limits during these developmental periods. Computers are far more advanced today so the segregated control structure is being reanalyzed.

Our team is investigating methods to overcome the deficiencies of the segregated system while maintaining robust and timely optimizations for both scheduling and control objectives.

Support for this research comes from the Nation Science Foundation.